Menard, Inc.

Valley, NE

Project Description

During a one month project in 2012 Holubar constructed two industrial tracks totaling 3,340 feet of new track. The new construction added on to the previous two industrial tracks constructed by Holubar Construction in 2009. This project also include the construction of a No. 9 115# Turnout, 2010 track feet of 3-rail flange crossing and the installation of a bumping post.

View All Projects

Project Details

  • Client Menard, Inc.
  • Type New Construction
Back to Top